At Alpine Mold, quality is the foundation of every mold we design and every plastic part we produce. For over 20 years, we have specialized in precision injection mold manufacturing and injection molding services, helping global customers achieve stable, reliable, and cost-effective production. Our mission is simple: deliver zero-defect molds and parts, on time, every time.
Process Phase | Key Check | Alpine Standard & Method | Frequency / Sampling | Owner (Lead|Support) |
Supply Chain (IQC) | Material compliance & moisture | Match BOM + COA + RoHS/REACH; spot FTIR/spectro if needed; moisture per datasheet (PA66 ≤0.20%, PC ≤0.04%) with drying curves | Each lot; AQL 1.0 | IQC|SQE, Process |
DFM & Moldflow | Manufacturability / cooling | Moldflow for fill/pack/warp; cooling ΔT ≤ 3 °C; customer-signed DFM | Per project | Design|PM, Process |
Mold Design | Standardization & safety | HASCO/DME/LKM; slider/core-pull safety factor ≥1.3; replaceable wear inserts; vent/gate/draft/cooling validated; design review checklist | Each mold | Design|PM, Process |
Tooling (Steel & Machining) | Steel, hardness & precision | P20 HRC 28–32, H13/S136 HRC 48–52 (±1 HRC); core/cavity fit ±0.01 mm (or tighter); coaxiality controlled | Each mold / in-process | Tooling|QA, Metrology |
Trials (T0–T2) | Mechanism & hot runner health | Smooth ejection/slider/core-pull; hot runner stable (no stringing/leakage); trial checklist | Every trial | Process|Tooling |
FAI | Dimensions & capability | CMM/2D/3D; Critical CpK ≥ 1.67, Important ≥ 1.33; lock recipe after approval | First run & any change | IPQC|Metrology |
Mass Production (IPQC) | Process window, appearance & SPC | Parameters locked; changes via ECR/ECN; SPI/VDI + limit samples; weight X̄–R trending | Per shift / Hourly / q2h | Process|IPQC, Production |
Reliability (Lab) | Environmental / chemical / UV | −30~70 °C, 2 h × 5 cycles; alcohol rub ×50; UV aging (if required) | NPI / ECN | QA|Lab |
Final QC & Outgoing (FQC/OQC) | AQL & function | AQL: Key 0.65, General 1.0, Appearance 1.5; assembly torque/clip/pull tests; fail → 100% re-inspect | Each lot | FQC|OQC |
Packaging & Logistics | Transit protection | VCI/vacuum/anti-scratch; 1.2 m 6-face drop; 24 h stack test; barcode labels | New/changed pack & audits / Each lot | IE|QA, Warehouse |
Metrology | Instrument calibration | Calipers monthly / yearly external; Zeiss CMM yearly external; vision/colorimeter/moisture per register | As per register | Metrology|QA |
Nonconformance | 8D closure | Isolation; containment ≤24 h; root cause → corrective/preventive → verification | Each case | QA|Dept. Owner |
Traceability | End-to-end code | Raw lot → dryer → machine → mold ID/cavity → inspection → shipment; data retention ≥2 years | Continuous | Warehouse|QA, Production |