We control mold quality through strict inspection and process control at every stage, from material inspection and machining to mold assembly, trial, and final validation.
Our quality control includes IQC, IPQC, and FQC inspections, dimensional checks with CMM equipment, mold trial reports, and sample inspection before final approval.
Only after the mold and samples meet the confirmed requirements will the mold be approved for shipment or mass production.
We also provide complete project documentation for quality traceability, including:
1. DFM Analysis Report
2. Mold Flow Analysis Report
3. 3D Mold Design Drawings
4. Detailed Tooling Schedule & Timeline
5. Original Steel Material Certificate
6. Heat Treatment Hardness Certificate
7. Full Mold Trial Reports (T1, T2, and further revisions)
7. Dimensional Inspection Report of Molded Samples
8. Sample Inspection Report
9. Final Packing & Shipping Documents before delivery