WhatsApp: +86 18126157548     Email: kerry@alpinemold.com
Home / Resources / Blog / Export Injection Molds: What Global Buyers Should Know

Export Injection Molds: What Global Buyers Should Know

Views: 0     Author: Site Editor     Publish Time: 2025-09-22      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Table of Contents

1. Why Global Buyers Source Injection Molds Overseas
2. Defining the Scope of an Export Mold Project
3. Technical Foundation: Aligning Early to Avoid Costly Delays
4. Tooling Strategy and Architecture: Choosing the Right Mold Concept
5. Mold Life, Reliability, and Maintainability
6. Cost Structure: What Really Drives Export Mold Price
7. Quality Control Framework: From Design to FAT/SAT
8. Export Logistics and Compliance: Getting the Mold Safely to Your Factory
9. IP Protection and Contract Essentials
10. Supplier Evaluation and Audits: Choosing the Right Partner
11. Transfer to Production: From T0 to Stable Mass Manufacturing
12. Common Pitfalls in Export Injection Molds—and How to Avoid Them
13. Buyer’s RFQ/PRD Checklist for Export Injection Molds
14. FAQ: Common Questions About Export Injection Molds
Conclusion: Turning Export Molds into Long-Term Assets


1. Why Global Buyers Source Injection Molds Overseas


When international companies search for export injection molds, their decision is rarely based on price alone. The real driver is value across the entire product lifecycle.

  • Cost efficiency with scale: Tool shops in China and other manufacturing hubs can leverage advanced CNC/EDM machining, automated polishing, and multi-cavity capabilities to deliver molds at 20–40% lower overall cost compared with many domestic suppliers.

  • Access to specialized expertise: Mature suppliers who export regularly already know HASCO, DME, and LKM standards, which means your mold will integrate smoothly into your production line overseas without costly modifications.

  • Faster time-to-market: Buyers in consumer electronics, automotive, or medical sectors often face intense launch pressure. By using a supplier that integrates DFM, Moldflow, Mold Design, tooling, tryout, and even short-run molding under one roof, project lead time can shrink from months to weeks.

  • Insight for buyers: The true ROI of an export mold is not in the first invoice, but in how much scrap, downtime, and rework it avoids once in production. A mold that is 15% cheaper but delivers 20% more downtime is, in reality, the most expensive choice. That’s why experienced global buyers evaluate not only unit price, but also tooling philosophy, validation process, and service after export.



2. Defining the Scope of an Export Mold Project


Many buyers underestimate how important it is to clearly define what “the mold” includes before sending out RFQs. In export projects, ambiguity can quickly lead to disputes or unexpected costs.

A professional export plastic injection mold package usually includes:

  • Core, cavity, and inserts — with clear marking and replaceability for high-wear areas.

  • Mold base & standard components — aligned with HASCO/DME/LKM standards to ensure global compatibility.

  • Ejection and cooling systems — with documentation of circuit design to simplify maintenance overseas.

  • Hot runner or cold runner systems — including brand, nozzle type, and control strategy.

  • Spare parts kit — ejector pins, wear plates, O-rings, and inserts that reduce downtime at the buyer’s factory.

  • Documentation — DFM/Moldflow analysis, steel certificates, heat-treatment reports, 2D/3D CAD of the mold, inspection reports, and maintenance manuals.

  • Trial samples — T0/T1/T2 samples with CMM reports to verify that the mold meets dimensional and cosmetic standards before shipment.

Insight for buyers: Never assume the supplier’s definition of “mold complete” matches yours. For example, some shops ship molds without a hot runner controller or without steel certificates. That can cause unexpected costs and delays when the mold arrives at your plant. The best practice is to create a scope checklist in your RFQ, which prevents both misunderstandings and hidden costs later.


3. Technical Foundation: Aligning Early to Avoid Costly Delays


When sourcing export plastic injection moulds, the technical foundation you establish at the beginning will decide whether your mold runs smoothly—or causes endless rework later. The early alignment should include DFM, Moldflow, tolerance definitions, resin selection, and surface requirements.


3.1 DFM and Moldflow: Your First Line of Defense


DFM (Design for Manufacturability) ensures the part can actually be molded without costly tool changes. Typical checks include draft angles, wall thickness consistency, rib-to-wall ratios, gate positioning, and ejection accessibility.

Moldflow analysis simulates how resin will flow, pack, and cool inside the cavity. It highlights weld lines, air traps, potential sink marks, clamp tonnage, and cooling balance issues before cutting steel.

模流分析


Insight: Buyers who skip Moldflow to “save time” often lose weeks later when the first T0 trial shows short shots or warpage. A $500–1000 Moldflow report can prevent $10,000+ in steel rework. Global buyers should always demand DFM + Moldflow reports as part of the quotation package.


3.2 Tolerances, GD&T, and Critical-to-Quality Features


  • Define Critical-to-Quality (CTQ) features: e.g., snap-fit dimensions, sealing interfaces, optical clarity zones.

  • Align on GD&T (Geometric Dimensioning and Tolerancing) to avoid vague statements like “tight tolerance.”

  • Confirm measurement methods: Will CTQs be checked via CMM, projector, or functional gauges?

Insight: A common buyer mistake is leaving tolerances “open to interpretation.” If one supplier builds to ±0.05 mm and another to ±0.2 mm, you’ll get two very different molds—and production headaches. Always connect tolerance with measurement method and acceptance criteria.


3.3 Resin Choice and Tooling Implications


The selected resin directly impacts tool steel, cooling, venting, and polishing:

  • Amorphous resins (ABS, PC) flow easily but may need gate cosmetics attention.

  • Semi-crystalline resins (PA, POM) shrink more, requiring robust cooling and tolerance management.

  • Glass fiber-filled materials wear steel aggressively; demand H13 or S136 hardened inserts.

  • Clear plastics (PC, PMMA) require SPI A2/A1 polish and careful gate placement.

  • High-temp resins (PPS, PEEK) call for advanced steel, special coatings, and high-temperature mold bases.

Insight: Global buyers sometimes specify resin only by “ABS” or “PC.” That’s not enough. An ABS for toys differs from flame-retardant ABS for electronics. Always provide the exact resin grade (e.g., PC Lexan 945U) to avoid wrong assumptions that can double your mold rework cost.


3.4 Surface Finish and Texture Expectations


  • Use global texture standards such as SPI, VDI, MT, YS.

  • Ensure draft angle is adjusted for texture depth (VDI 30 needs more draft than SPI A1 polish).

  • Define cosmetic acceptance levels: flow lines, weld lines, and gloss variations.

Insight: Many overseas buyers expect “Apple-level cosmetics” but don’t define it. If you don’t specify, suppliers will apply their own shop standard. The result? Disputes. A good practice is to request texture plaques or polished samples before mold finishing.


高光模具


4. Tooling Strategy and Architecture: Choosing the Right Mold Concept


Your export plastic injection mold strategy determines both upfront investment and long-term ROI. The architecture—runner system, cavity count, mechanisms, and steel choice—must be matched to your part design and annual volume.


4.1 Cold Runner vs. Hot Runner


Feature

Cold Runner

Hot Runner

Upfront Cost

Lower mold cost

Higher initial investment

Material Usage

More waste (sprues/runners need trimming/recycling)

Minimal waste, resin saved over volume

Cycle Time

Usually longer

Shorter cycle, faster production

Part Cosmetics

Gate vestige more visible, not ideal for high-end parts

Better gate cosmetics, fewer visible marks

Best Suited For

Low-to-medium volume, commodity resins, lower budget projects

High-volume runs, expensive resins, aesthetic-critical parts


Insight: A common pitfall is choosing cold runner just to “save money.” For a project with 1M+ parts/year, the runner waste can exceed the mold cost in 12 months. Smart buyers ask suppliers to calculate Total Cost of Ownership (TCO), not just mold price.


4.2 Single, Family, or Multi-Cavity Molds


  • Single cavity: Fastest validation, easy to modify, but higher part cost.

  • Family mold: Groups multiple parts together, saves tooling cost, ensures color consistency. Risk: imbalance between part sizes can cause uneven filling.

  • Multi-cavity: High efficiency, low cost per part, but requires perfect balance and robust maintenance.

Insight: Many global buyers think “more cavities = cheaper.” But a poorly balanced 8-cavity mold produces 8 bad parts per cycle instead of 1. A smarter strategy may be 2×4-cavity molds instead of 1×8-cavity, offering flexibility and backup in case of downtime.


多腔模具


4.3 Complex Mechanisms: 2K, Overmolding, and Unscrewing


  • 2K / Two-shot molding: Two materials/colors in one mold cycle; needs rotating cores or transfer tools.

  • Overmolding: Substrate plus soft-touch or secondary resin; requires adhesion know-how and tool design for sealing.

  • Unscrewing molds: Required for precision threads; adds cost but prevents stripping.

  • Sliders, lifters, collapsible cores: Enable undercuts and complex geometries; require precise lubrication and robust design.

Insight: Overseas buyers sometimes underestimate how much complexity increases maintenance cost. A mold with 10 sliders exported overseas may be hard to service locally. Always ask: “Can my local team maintain this mechanism, or do I need a simpler design?”


4.4 Steel and Hardening Strategy


  • P20: Economical, moderate hardness, suited for medium volume.

  • H13 / S136: Hardened stainless steels, excellent for wear resistance, corrosive resins, or polished surfaces.

  • Insert hardening: Use hardened inserts for gates, edges, or fiber impact zones.

  • Coatings: Nitriding or PVD coatings extend life against abrasive glass-filled resins.

Insight: Steel selection is where many buyers get trapped by low quotes. A P20 mold may look fine for 50k shots but fail after 200k, forcing rebuilds. A smart buyer doesn’t just ask, “What steel are you using?”—they ask, “Why is this steel chosen for my resin and my expected mold life?”


5. Mold Life, Reliability, and Maintainability


When buying export injection mould, one of the first questions global buyers should ask is: “How many shots can this mold really run?” Mold life is determined by steel selection, maintenance strategy, and production environment.

  • Mold life ranges:

Prototype molds: tens of thousands of shots, usually for testing or pilot runs.

Production molds: 500k–1M+ shots, designed for stable high-volume output.

  • Design for maintainability:

Replaceable inserts in high-wear zones (gate, runner, ejector sleeves).

Accessible cooling circuits with quick connectors.

Clear lubrication paths for sliders, lifters, and unscrewing systems.

  • Spare parts strategy:

Most reliable suppliers ship a spare kit with ejector pins, bushings, O-rings, and wear plates.

Insight: Many buyers ask only for “tool life in shots,” but that’s incomplete. A 1M-shot mold built with poor cooling may last mechanically—but will produce warped parts after 200k shots. True mold life = durable steel + stable process window + maintainability. Always verify mold design drawings for service access before approvin


6. Cost Structure: What Really Drives Export Mold Price


One of the biggest mistakes in sourcing overseas injection molds is focusing only on the quoted price. The real question is: What’s driving this number, and what’s hidden behind it?


Key Cost Drivers


  • Part size & complexity – Thin walls, undercuts, or optical surfaces demand more machining, polishing, and validation.

  • Cavity count – More cavities = higher efficiency, but also more steel, machining hours, and balancing work.

  • Runner system – Hot runner systems cost more upfront but save resin and cycle time.

  • Steel grade & heat treatment – P20 vs H13/S136 makes a huge difference in cost and durability.

  • Surface finish & texture – SPI A1 mirror polish or VDI texture can add 20–30% to mold hours.

  • Tolerance & metrology needs – Tight GD&T requires CMM, optical scan, and repeated validation.

  • Validation scope – FAT/SAT, Cpk studies, DOE trials, and documentation add to upfront cost.

  • Lead time – Faster deliveries mean higher machining shifts and premium costs.

Insight: A reliable benchmark is that production molds typically cost 2–3× more than prototype molds because they use premium steels, hardened inserts, and multi-cavity layouts. Smart buyers don’t ask only “how much,” but also “what’s included.” A cheaper mold that excludes validation or spare parts will always cost more later.


7. Quality Control Framework: From Design to FAT/SAT


For global buyers, the single biggest risk in exporting plastic injection mold is receiving a tool that doesn’t perform once it lands in your factory. That’s why a structured quality control framework is essential.


Stage

Key Activities

Deliverables / Outputs

7.1 Pre-Build Alignment

- Signed-off DFM and Moldflow reports

- Approval of gate, parting line, venting, cooling layouts

- Confirm steel list & certificates

- Define acceptance criteria (cosmetic, CTQs, functional)

✔ Approved DFM/Moldflow

✔ Steel certificates

✔ Acceptance criteria document

7.2 In-Process Controls

- Tool design review at multiple checkpoints (2D & 3D)

- Machining accuracy logs (CNC/EDM)

- Pre-assembly dimensional inspection

✔ Design review records

✔ Machining logs

✔ Inspection reports

7.3 FAT (Factory Acceptance Test)

- Run samples at supplier’s press with agreed resin

- Verify dimensions, CMM, cosmetic standards

- Document process window (melt temp, mold temp, cycle, pressure)

✔ FAT sample parts

✔ CMM reports

✔ Golden Process Sheet

7.4 SAT (Site Acceptance Test)

- Replicate FAT conditions at buyer’s site

- Verify repeatability under buyer’s machines

- Confirm cycle stability (no flash, sticking, cooling imbalance)

✔ SAT verification report

✔ Stable production trial parts

7.5 Documentation Package

- DFM/Moldflow reports

- Final 2D/3D drawings and BOM

- Steel & heat-treatment certificates

- Sampling data & inspection reports

- Maintenance manual + spare parts list

✔ Full documentation pack for mold handover



Insight: A common export mold failure happens when the supplier runs FAT at their optimized settings but doesn’t share them. When the buyer tries SAT, parts fail. The lesson: always request a “Golden Process Sheet” at FAT—including all parameters—so you can mirror results at your plant.


8. Export Logistics and Compliance: Getting the Mold Safely to Your Factory


8.1 Choosing the Right Incoterms for Tooling


  • EXW / FCA – Buyer arranges shipping; transparent costs but requires strong logistics capability.

  • FOB / CIF – Supplier handles shipping to port (FOB) or port + insurance (CIF). Popular in Asia-Europe trade.

  • DAP / DDP – Delivered to buyer’s site (DDP includes duties/taxes). Convenient but may hide embedded logistics costs.

Insight: New buyers often pick CIF because it “feels safer.” In reality, insurance coverage may be minimal unless you specify “All-Risk.” Always clarify who holds responsibility at each stage and what insurance level is included.


8.2 Packaging Standards for Export Injection Molds


Proper packaging is the difference between a mold arriving production-ready and one needing rework. A professional supplier should provide:

  • Vapor Phase Inhibitor (VPI) protection and anti-rust grease on all steel surfaces.

  • Desiccants and sealed bags for humidity protection during sea freight.

  • ISPM-15 certified wooden crates, reinforced for heavy weights.

  • Blocking and bracing inside crates to prevent vibration.

  • Shock and tilt indicators on the crate.

  • Plugged water and hydraulic channels to avoid contamination.

Insight: Many buyers only check “wooden box packaging.” But without VPI + desiccants, sea transit humidity can corrode the tool in weeks. Always request photo documentation before crating, including steel condition and internal blocking.


木箱发货



8.3 Shipping, Insurance, and Customs


  • Mode: Air freight for urgent small tools; sea freight for large, heavy molds.

  • Insurance: Insist on all-risk cargo insurance with declared mold value.

  • Customs documents: HS code, packing list, invoice, and certificate of origin.

  • Traceability: Each crate should have a mold ID, photos, and component checklist.

Insight: Some buyers rely 100% on their supplier’s freight forwarder. But if delays occur at customs, suppliers often shift responsibility. Smart buyers appoint their own forwarder or at least request full shipping documentation upfront.


9. IP Protection and Contract Essentials


For overseas buyers, the biggest fear in export injection mold projects is IP leakage—seeing your mold or part design appear in another market. The solution lies in contracts and controls, not just trust.


9.1 Non-Disclosure and Ownership Clauses


NDA before CAD sharing – Make it mutual and specific to CAD data and tool designs.

Ownership clause – Mold belongs to the buyer once milestone payments are made. Require a mold ID plate with your company’s name engraved.

No-reuse clause – Supplier cannot reproduce your mold or use CAD for third parties.


9.2 Change and Access Control


Any design change requires written approval from the buyer.

Buyer receives native CAD files (2D, 3D, electrode data) after tool completion.

Include audit rights to review tool storage if mold remains at supplier’s site.


9.3 Jurisdiction and Dispute Resolution


Specify governing law (often buyer’s country or neutral arbitration hub).

Define arbitration location and enforcement method.

Insight: Some buyers assume “a contract in English” is enough. In practice, if you don’t define jurisdiction, your case may default to local courts in the supplier’s country—hard to enforce internationally. Smart buyers use neutral arbitration hubs like Hong Kong, Singapore, or Geneva.


10. Supplier Evaluation and Audits: Choosing the Right Partner


Not all overseas mold suppliers are equal. The difference between a reliable partner and a risky one lies in process maturity, transparency, and after-sales support.


10.1 Capability Checklist


  • End-to-end services: DFM, Moldflow, Mold Design, CNC/EDM, polishing, assembly, and sampling presses under one roof.

  • Standard compliance: Familiar with HASCO, DME, LKM, MISUMI.

  • Metrology: Zeiss CMM, optical scanners, hardness testers for precision validation.

  • Project management: Dedicated PM, weekly progress updates, Gantt tracking.



10.2 Quality System and Certifications


  • ISO 9001 for general quality management.

  • IATF 16949 alignment if automotive parts are involved.

  • Medical compliance for biocompatible plastics and cleanroom molding.


10.3 Sample Room and Case Studies


  • Ask for real case studies similar to your project (e.g., clear PC housings, PA66+GF automotive clips, 2K consumer parts).

  • Inspect sample parts to evaluate cosmetic quality, surface finish, and molding stability.


10.4 After-Sales Support


  • Spare parts kit included.

  • Remote troubleshooting and online support.

  • Clear rework or warranty policies if mold issues appear during SAT.

Insight: Many buyers audit only via a capability list. But true evaluation comes from process transparency—does the supplier show machining logs, share CMM reports, and allow video audits in assembly bays? A partner willing to open its doors is usually one you can trust for long-term cooperation.


11. Transfer to Production: From T0 to Stable Mass Manufacturing


When an export injection mold arrives at your plant, the critical question is: “Can it run stably in my environment, not just at the supplier’s factory?” The answer lies in how you handle the transfer process—T0/T1/T2 trials, DOE studies, and SAT validation.


11.1 T0 (First Mold Trial)


  • Purpose: Debug tool function—flash, short shots, sticking, and major dimensional errors.

  • Expect to make adjustments to venting, gating, or cooling.


11.2 T1 (First Sampling with Adjustments)


  • Run the mold with near-nominal settings.

  • Inspect Critical-to-Quality (CTQ) dimensions via CMM.

  • Document cosmetic results and identify hotspots (flow lines, weld lines).


11.3 T2 (Optimization and Stability)


  • After corrections, confirm dimensional and cosmetic targets are met.

  • Run DOE (Design of Experiments) to map process window (melt temp, mold temp, packing, cooling).

  • Lock the Golden Process Sheet—a documented parameter set to replicate FAT at your site.


11.4 PPAP-Like Validation for High-Risk Parts


For automotive, aerospace, or medical, treat T2 as a mini PPAP (Production Part Approval Process):

  • Capability indices (Cpk) for CTQs.

  • Control plan and PFMEA for production risks.

  • Gauge R&R for measurement repeatability.

Insight: A mold that “looks good” at FAT can still fail in production if no DOE is performed. Experienced buyers know that stability—not just a good part—is what defines mold acceptance. Always request short-run capability data at T2.


12. Common Pitfalls in Export Injection Molds—and How to Avoid Them


Even experienced global buyers fall into traps when sourcing overseas molds. Understanding these pitfalls can save months of frustration.


12.1 Skipping Early Validation


Mistake: Cutting steel without DFM/Moldflow.

Result: Late-stage rework, extra weeks added to timeline.

Solution: Make DFM/Moldflow approval a contractual milestone.


12.2 Vague Acceptance Criteria


Mistake: Telling suppliers to “meet high quality.”

Result: Misaligned cosmetic and tolerance standards.

Solution: Define GD&T, CTQs, cosmetic samples, and metrology methods upfront.


12.3 Under-Specifying Steel and Heat Treatment


Mistake: Accepting “P20 mold” without questioning suitability.

Result: Mold wears out early under glass-fiber resin.

Solution: Link resin type + shot life + steel grade in your RFQ.


12.4 Ignoring Cooling and Cycle Time


Mistake: Focusing only on part dimensions.

Result: Cycle times double, increasing part cost.

Solution: Review cooling circuit design in 3D before approval.


12.5 Overlooking Export Packaging


Mistake: Trusting “wooden crate” without inspection.

Result: Corrosion or damage in transit.

Solution: Require VPI protection, desiccants, photos before sealing.


12.6 Weak IP Clauses


Mistake: Sharing CAD without NDA or ownership clauses.

Result: Mold copy appears in another market.

Solution: Use binding contracts with jurisdiction and arbitration defined.

Insight: The most expensive mold is not the one with the highest quote—it’s the one that causes six months of delays. Smart buyers don’t just compare price—they compare risk mitigation strategies.


13. Buyer’s RFQ/PRD Checklist for Export Injection Molds


A well-prepared RFQ (Request for Quotation) or PRD (Product Requirement Document) separates successful global buyers from costly beginners. Here’s a structured checklist to ensure nothing is missed.


Part & Volume Requirements


  • 3D CAD (STEP/XT) + 2D drawings with GD&T.

  • Target resin grade and color (e.g., PC Lexan 945U, black).

  • Estimated annual volume and ramp-up curve.

  • End-use application (automotive interior, medical housing, consumer goods).


Tooling Specifications


  • Cavity count target (single, family, multi-cavity).

  • Runner system preference (hot vs cold, brand if hot runner).

  • Mold standard (HASCO, DME, LKM).

  • Expected mold life (e.g., 1M shots for automotive).

  • Steel grade preference (P20, H13, S136).


Quality & Validation


  • CTQ list with tolerances and inspection method.

  • Surface finish/texture standard (SPI/VDI).

  • Required DFM and Moldflow analysis.

  • FAT/SAT acceptance criteria (dimensional, cosmetic, functional).

  • Documentation requirements (CMM report, steel certs, maintenance manual).


Logistics & Legal


  • Preferred Incoterm (EXW, CIF, DDP).

  • Shipping mode (air for urgency, sea for heavy molds).

  • IP protection clauses (NDA, ownership, no-reuse).

  • Jurisdiction for dispute resolution.

  • Payment terms and milestone structure.


Insight: A complete RFQ is not only about getting an accurate price—it’s a filter. Reliable suppliers respond clearly with aligned solutions, while weak ones provide vague answers. In effect, your RFQ doubles as your first audit tool.


14. FAQ: Common Questions About Export Injection Molds


Q1: Should I always choose a hot runner for export molds?

Not always. For <100k parts annually or simple commodity resins, cold runner may be more cost-effective. For >500k parts or expensive resin, hot runner reduces waste and improves ROI.

Q2: How do I protect my design IP overseas?

Sign NDAs, require ownership clauses, engrave mold ID plates with your company name, and define jurisdiction in your contract.

Q3: What is the most common cause of mold failure after export?

Improper cooling and lack of maintenance access. Always review cooling circuits and request spare kits.

Q4: How do I ensure my mold runs the same at my site as at the supplier’s?

Request a Golden Process Sheet at FAT, and replicate parameters during SAT. Without it, you may struggle to match part quality.

Q5: What’s a quick checklist before issuing RFQ?

Provide CAD, resin grade, annual volume, surface finish, steel preferences, CTQs, acceptance criteria, and Incoterm expectations.


Conclusion: Turning Export Molds into Long-Term Assets


Exporting injection molds is no longer just a cost-saving exercise—it’s a strategic decision that impacts product quality, launch timelines, and lifecycle costs. By focusing on DFM/Moldflow validation, steel selection, FAT/SAT discipline, Incoterm clarity, and supplier transparency, global buyers can transform export molds into long-term production assets.

Alpine Mold, is a professional plastic injection mold manufacturer in China. we’ve delivered over 10,000 molds worldwide with zero failure rate, serving industries from automotive to medical. Whether you need a single-cavity prototype, a multi-cavity production tool, or a 2K/overmolded solution, our team ensures that your mold arrives export-ready, validated, and backed by reliable support. Contact us today!


Subscribe to our newsletter!

Quick Links

Industries

Capabilities

Contact Us

Add: Block 3A, the 6th Industrial Area, Heshuikou Village, Gongming Town, Shenzhen City, Guangdong Province, China
 
Telephone: +86 18126252427
WhatsApp: +86 18126157548
 
Copyright © 2024 Alpine Mold Engineering Limited(Alpine Mold) All Rights Reserved. Sitemap